日批在线观看,亚洲精品影院,午夜精品久久久久久久久久久久,亚洲精品久久,久久亚洲国产精品无码一区,亚洲高清AV,欧美午夜精品久久久久免费视,日韩精品久久久

Company News
For the Clear Water of the River—Luzhou Laojiao Wine Making Co., Ltd. Wastewater Treatment Station Upgrade Technical Transformation Project Passed Acceptance
  • 2019/12/31
  • From:Chengdu Engineering Co., Ltd. of China Light Indus

Project Background: Located in the upper reaches of the Yangtze River, Luzhou city is the confluence of the Yangtze River and its tributary Tuojiang River. Water pollution will seriously affect the middle and lower reaches of the Yangtze River. Sewage discharge and treatment has become a long-term problem in Luzhou Laojiao wine making base.

 

On December 9, 2019, the technical transformation project of the sewage station of Luzhou Laojiao designed by our company’s overseas engineering department successfully passed the inspection and acceptance of the government functional authorities, and passed the internal acceptance of Luzhou Laojiao on December 19, 2019.


This project is an EPC project jointly contracted by our company and Sichuan Industrial Equipment Installation Company. Our company is mainly responsible for the engineering design of this project.


The project is located in the original sewage treatment station of Luzhou Laojiao, Luohan Town, Longmatan District, with a daily treatment scale of 2000m3/d. The project is carried out in the original station for technical renovation, so there is a shortage of land and many restrictive factors for renovation. The composition of in-fluent water is complex. There are high concentration of organic matter in waste water, uneven water quality and water quantity, and less waste water output when production is stopped every year. In addition to meeting the sewage treatment process that meets the sewage treatment standards, the design must also comprehensively consider the use of the first phase of construction during the high temperature shutdown period (July to August each year) and the second phase of construction during the production period after the recovery period.

  圖片1.jpg

A View before Renovation


The process of this project adopts advanced automatic control scheme, adopts hierarchical and distributed control mode for each process unit, and carries out centralized control in the control room, so as to ensure the concentration, stability and reliability of sewage treatment. The designed water quality requirements shall meet the direct discharge standard in Table 3 of the "Water Pollutant Discharge Standard for Fermented Alcohol and Liquor Industry" (GB27631-2011). During the trial operation, the final discharge concentration is lower than the discharge limit.


The sewage station upgrading technical transformation project of Luzhou Laojiao successfully reached the standard and put into production, setting an industry benchmark for sewage treatment in the liquor industry, and also sending the best gift for the clear water of the river in 2020.

 

圖片2.jpg

圖片3.jpg

Scene View of the Construction 

枝江市| 中阳县| 长葛市| 遂川县| 鸡东县| 石渠县| 丽水市| 巴里| 阳原县| 商南县| 武夷山市| 五家渠市| 雅安市| 赤城县| 辰溪县| 正定县| 益阳市| 天峻县| 颍上县| 上思县| 石河子市| 普陀区| 湘潭县| 巴青县| 鄂伦春自治旗| 垦利县| 普格县| 同心县| 阿拉善右旗| 贵定县| 乌恰县| 平遥县| 彭泽县| 韶山市| 南岸区| 临洮县| 本溪| 张家口市| 厦门市| 宁都县| 霍邱县|